  1. The task of ME covers not only the operation & maintenance of Generation, Transmission & Distribution Sectors as well as the planning, studies & building new projects.
  2. Insure meeting of demand (domestic, commercial, industrial agricultural & governmental) to comply with the needs of society, economy & environment.
  3. Improving the reliability, availability & quality of the supplied energy
  4. Cooperate & coordinate with other Institutions and utility to setup programs for developing & upgrading the Electrical power system with the latest advanced technology.
  5. Enhancing the capacity building & institutional framework to ensure the safety of both the employee and the electrical system and meeting environment standards.
  6. Supporting & encourage national & foreign investors.
  7. Consider the Iraqi network as a apart of the international power grid through the interconnection agreement among the seven countries.

To view the full presentation click here.

   
   
  1. Taji – Rehabilitation of gas turbine units no. 1, 4 and 6 (3 x 20 MW)
  2. Mosul – Rehabilitation of gas turbine units 2 & 4 (2 x 20 MW)
  3. Al-Mussaib TPS Mussaib Emergency Rehabilitation of Unit 1, Stage II (1 x 300MW)
  4. Rehabilitation of National Dispatch Centre - Stage 2
  5. Emergency Assistance to essential Services Iraq
  6. Al-Muthanna governorate electricity network reinforcement programme
  7. Muthana Governorate Capacity Building and Institution Reinforcement Programme
  8. Support to the electricity and Health Sectors in the Emergency and Long term Context

 

View the full monthly report of May 2008 from here.

   
   
  1. Taji – Rehabilitation of gas turbine units 1, 4 & 6 (3 x 20 MW)
  2. Mosul – Rehabilitation of gas turbine units 2 & 4 (2 x 20 MW)
  3. Al-Mussaib TPS Mussaib Emergency Rehabilitation of Unit 1, Stage II (1 x 300MW)
  4. Rehabilitation of National Dispatch Centre - Stage 2
  5. Emergency Assistance to essential Services Iraq
  6. Muthana Governorate Capacity Building and Institution Reinforcement Programme
  7. Support to the electricity and Health Sectors in the Emergency and Long term Context

 

View the full monthly report of May 2008 from here.

   
   
  1. The required investment is estimated to be $16 Billion US Dollars from the period 2007 – 2010 according to the National Development Strategy issued by the Ministry of Planning and Development Cooperation and these estimates include government and private investments.
  2. Rehabilitation of the existing power plants to produce electric power to their existing access design capacity. This will have a low cost effectiveness as well as short time for implementation.
  3. Establishment of new production plants (Thermal & Gas) according to the central plan to cover the entire requirement of electricity power till 2012.
  4. The MoE’s plan includes the establishment of Gas Turbine projects units as
    follows :
    • 60 Units 125 MW each (GE)
    • 4 units 40 MW each (GE)
    • 6 units 260 MW each (SIEMENS)
    • 10 units 160 MW each (SIEMENS)

 