The Baghdad Company is a complete installation, maintenance and service provider for a wide variety of electricity generating devices. The company focuses on gas, steam and diesel powered generators for which it has an unrivalled depth of experience and expertise. The company has carried out numerous large-scale industrial projects throughout Iraq and has a strong reputation in its field. The Baghdad Company is in a position to install and renovate a large range of different machines with all mechanical and electrical works undertaken.
|
|
| The company is backed by a strong team of engineers who have over two decades of combined experience working on power station rehabilitation and maintenance. The team is comprised of a well-equipped group of engineers, technicians, planners and skilled workers who are able to carry out works of any size and scope. |


Scope of Work:
- Erection, Maintenance & rehabilitation of all parts of the Power Stations (boiler, turbine, pumps, heat exchangers, water pipes, steam pipes, n. gas pipes, air pipes, fuel pipes lines generators, main switch board & control panel) including the construction of all these parts according to the drawings, instruction & supervision of the supplying company.
- Execution of indoor & outdoor electrical sub-stations.
- Execution of networks transmission lines (33KV, 132KV & 400KV) with the suitable towers for each line, including all civil, mechanical & electrical works.
- Manufacturing of control & power panels of different shapes & capacities.
- Execution of all kinds of fuel & water tanks (i.e fixed or floating roofs fuel tanks) and different types and diameters of pipe lines for water fuel, N. Gas & Air (carbon steel pipes & St. Steel pipes).
- Execute of small and large oil refineries.
- Execute of water treatment units and plants. Manufacturing of a small fire tube boilers up to 20 Ton/h in capacity also manufacturing heat exchangers.
- Maintenance & rehabilitation of Gas turbine units, also the construction of new units including the civil, Mechanical and electrical works with all auxiliaries.


Capabilities:
Type |
Description |
Service:
|
Engineering, procurement and construction (EPC) for new or the expansion of power plants with skid mounted or mobile electrical power generating units. |
Turnkey for the rehabilitation and upgrade of exiting power plants. |
Focus on gas turbines, both heavy industrial and aero-derivative power generation units. |
Technical supervision and staffing in the fields of electro, mechanical and civil work. |
Operation and maintenance of power generation plants as per OEM standards. |
Training power plant operators in the operation and maintenance. |
Inspection and assessment of exiting units. |
Pipe lines services including, inspection and repair. |
Mechanical: |
On EPC basis for new or expansion of power plants. |
Wide range of technical support services with focus on gas turbines, both heavy industrial and aero-derivative generating unit. |
Manpower technical support services including technical direction for installation, commissioning of new equipment, start up & commissioning and troubleshooting services. |
Turnkey services for complete gas turbines, gas generator, hot section, power turbines, combustion inspection, hot gas path inspection and major overhaul. |
Major and minor plant installations. |
Maintenance, repair, overhauling and condition monitoring of rotating & reciprocating equipment for power plants, oil and gas petrochemical and industrial plants. |
Testing, repair and overhaul and maintenance. |
Project Management: |
Iraqi owned and operated company with over 10 years experience in gas & steam turbines and diesel electrical generation, with focus on gas turbines. |
Experience in installation, commissioning & start up, overhaul, maintenance and operations on electrical power generations gas turbines unit. |
Personnel: |
Over 100 permanent employees in the area of field engineering and project management backed by general electric and Hitachi engineering and technical support. |
Training; customised training programme by OEM including, general electric facilities in Houston, Cincinnati, New York and Hitachi facilities in Japan & Thailand. 1000sqm workshop located north of Baghdad. |
Facilities & Service Agreements: |
Depending on volume, additional 300-400 filed engineer and technicians are available on contract basis. |
Three offices in Iraq (Mosul, Baghdad and Basra) and offices in Amman and Dubai, UAE. |
Renowned experience. Baghdad Co. has successfully executed a Turnkey projects for the installation, commissioning & start up. |
Overhaul maintenance and operation covering the following gas turbine units:
- General electric, Fr9E, Fr6B, Fr3 LM / TM 2500 LM6000
- Hitachi H25
- Rolls Royce Avon 1533, 34 and 35
- ABB 13D |
Supported by various OEMs including general electric and Hitachi. |
Multiannual master service agreements covering the country technical and engineering support for the following:
- GE aero-derivative: LM 6000
- GE energy services: Fr9 and Fr6
- GE oil and gas: Fr 5, compressors and pumps. |


Completed Projects:
No |
Project |
1 |
Rehabilitation of Unit No.1 in Al-Musaib Power Station (300 MW),
which includes: Boiler, Turbine, generator & all auxiliaries (Pumps, valves, Heat exchanger, tanks, water treatment plant, pipe lines…etc). Also the maintenance for the Sub-Station (indoor & Outdoor) of the unit in (all the Unit Transformers, C.Bs & checking all cables and wiring diagrams). Also the replacement of all the local control instruments & control panels with all cables & wirings then install a new instrumentation equipments & control panels with new cabling and wiring. |
2 |
Rehabilitation of Unit No.2 in Al-Musaib Power Station (300 MW) which includes: Boiler, Turbine, generator & all auxiliaries (Pumps, valves, Heat exchanger, tanks, water treatment plant, pipe lines…etc). Also the maintenance for the Sub-Station (indoor & Outdoor) of the unit i.e. (all the Unit Transformes, C.Bs & checking all cables and wiring diagrams). |
3 |
Execution of 400KV transmission lines. |
4 |
Rehabilitation the fourth unit of Baghdad South Power Station (55MW). |
5 |
Rehabilitation of (3) 80 Ton/h water tube boilers replacement of about 39000m of bank tubes, riser tubes, economizer tubes headers …etc. |
6 |
Rehabilitation a 5 Ton/h boiler. |
7 |
Rehabilitation of about 20 hospitals boilers of different capacities. |
8 |
Rehabilitation of water- pumps of Baghdad Municipal Office. |
9 |
Rehabilitation of the boiler of Al-Rasheed Hotel. |
10 |
Rehabilitation of the following items in the posts and concrete frames factory:
Reconditioning of three boilers, Designing and executing of the relatives control panels. Erection & reconditioning of 3-over head cranes, a 60 cubic meters/hour concrete patching plant, tubes and pumps located in the factory |
11 |
Rehabilitation of two boilers in Al-Qadisiya Company. |
12 |
Manufacturing of 2 Ton/Hr boiler for Salfonic factory, 1996. |
13 |
Manufacturing of (3) boilers 2 Ton/h each for three private soft drinks factories, 1999. |
14 |
Manufacturing of 5 Ton/h boiler for pre cast concrete factory, 2000. |
15 |
Manufacturing of 1 Ton/h boiler for Golden tomato paste. |
16 |
Manufacturing of 1 Ton/h boilers for Ibin-Yoanis Company. |
17 |
Consulting and supervision for the rehabilitation of petrochemical Company boiler in Basrah. |
18 |
Supplying of many spare parts for boilers to Al-Faris Company. |
19 |
Dismantling, transferring and re-constructing of 5 Ton/h boiler from Al-Rasheed factory to Al-Ma’moon factory for the state company of vegetable oil production. |
20 |
Rehabilitation of boilers and turbines of thermal power units no.1,2,3 in Baghdad south power station also carrying out the maintenance for the generators and automatic control & protection systems for these units. |
21 |
Rehabilitation of boilers and turbines of thermal power units no.3 in Dora power station. |
22 |
A contract of complete assessment of 39 diesel generators of 2MW each has been carried out by our technical staff in Mosul. |
23 |
Baghdad co. has been recently awarded a contract of erecting, installing and commissioning two gas units each 40MW in ALSAMAWA southern Iraq. |
24 |
Dismantling 6 gas turbine frame 5 from Portugal and transferred to Dubai for rehabilitation and then transferred to be installed with another (2) used units and (8) new units fram (5). |
To view their projects, click here.
|
|