On 08 December 2008 ABG come to an understanding with Baghdad Building Company for a joint Venture agreement for its awarded contract with major international partners. |

Al-Fath Construction - a leader in the construction industry

Al-Mustafa Engineering – for electrical and mechanical works. The company is specialized in manufacturing and supply of high & low tension electric boards and control panels, in addition to the installation and operation of central air-conditioning systems, electric power generators, power modulation units, lift and water & sewerage treatment plants. It has been given an “Excellent” rank classification by Baghdad Chamber of Commerce.
The decision of merging to get a perfect integration in the activities of these companies and to expand the range of potentiality and technical and technical and financial capabilities,
This decision was made to interact with Iraqi economy development, in order to achieve and effective role in the building of a new Iraq, and to enrich the course of the long and wide experience in their individual lines,
In view of the fact that those companies individually played a distinguished roles in their line of business, in executing and fulfilling several housing and infrastructure industrial
Administrative projects as main and subcontractors, and also as suppliers of different types of technical and high tech. equipments, (constructional, electrical, mechanical and ) in several other projects.
Our company were involved in the construction and implementation of many projects, where they obtained their distinguished experience in executing works in sectors of:
• Oil & Gas and Energy projects.
• Industrial and Commercial Building projects.
• Roads.
• Water and Sewerage projects.
• Housing projects.
The company has a highly qualified engineers, technicians and administrators to meet the technical requirements of our clients.
BB please to enclose hereby a list of some of the Main Iraqi Projects
Back to Top

Projects executed by BB and BT
| 1. |
Rehabilitation of unit No.1 in Musaiab Power Station. 300 MW units. Electrical ,Mechanical and Civil works. |
| 2. |
Installation of 2 V92.4 GT units in Baiji as subcontractors in a USACE project via Albright the main contractor. Electrical, Mechanical and Civil works. |
| 3. |
Prefabricated buildings and warehouse with steel structure roof protection and offices with steel structure roof protection in different locations in Baghdad. |
| 4. |
Supply and lay of marble and granite for the National Assembly Building project, a 5000 SQ M. |
| 5. |
Ventilation and Erection of ducting and cooling systems with Crown Agents UK , British Embassy Residence Compound. |
| 6. |
Camp hardening for Bearing Point Company . works included supply and install concrete T-section walls with barbed wires topping, sand bagging of the compound which has been relocated with all the necessary services connections for water, power and sewerage. |
| 7. |
Construction of warehouses and shelters for Bearing Point Company. |
| 8. |
Survey, data collection and geotechnical investigation works for the Compact water treatment plants project for Baghdad governorate with CC Jordan a sub-contract with Nippon, Japan. |
| |
|
| |
|

Previous contracts prior 2003
| 9. |
Roads networks and runways / different locations in Iraq. 1980 – 1990. |
| 10. |
Fuel tanks foundations, (5000 – 50000 m3 tanks) PC2 project. |
| 11. |
Pipe racks – Concrete structures, PC2 project. |
| 12. |
Air force officers club / Baghdad 1980 – 1984 |
| 13. |
Air force head quarters / Baghdad 1983 1984 |
| 14. |
Third Military Academy |
| 15. |
Express-way No.1 (Trebeil – Basra) |
| 16. |
Rehabilitation of Air-conditioning systems, for ministry of agriculture, Habbaniya resort, Baghdad Tourists Island, Melia Hotel. / Baghdad. 1993. |
| 17. |
Ministry of Agriculture building. 1986 |
| 18. |
Ministry of Industry building. 1987. |
| 19. |
Agriculture Committee buildings. / Ramadi, Kirkuk. 1987. |
| 20. |
Al-Muthanna Airport development project. 1980-1982 |
| |
|

Main jobs executed by the JV companies
| 1. |
Supply and installation of Sulfur Lock Units (28 units), Ministry of Oil – North Gas Co / Iraq. |
| 2. |
Rehabilitation works of Karkh sewage treatment plant / Baghdad, Mayoralty. |
| 3. |
Hydrogen unit, Dora refinery, (Mechanical Electrical and Civil works) / Baghdad. |
| 4. |
Steam Boilers unit, North Oil Company, (Mechanical Electrical and Civil works). |
| 5. |
Al-Zahra’a Hospital/Baghdad. |
| 6. |
Al-Rahman Bldg., 6 floors with basement / Baghdad. |
| 7. |
Al-Kamel Bldg, 4 floors with basement / Baghdad. |
| 8. |
Rehabilitation of warehouses, stores and steel pipe racks, Nasir Est / Baghdad. |
| 9. |
Supply of different types of machinery, technical and high-tech. test equipments, tools and raw materials to Ministry of Oil and Ministry of Housing. |
| 10. |
Supply and install electronic measurement systems and x-ray welding test systems, North Gas Co. and North Oil Co. |
| 11. |
Supply of pipes and fitting for condensation Tower, North Gas company. |
| 12. |
Supply of C Steel Plate and perforated tube sheets for heat exchangers, Ministry of Oil – North Gas Company / Iraq. |
| 13. |
Potable water network, ductile piping, Kadumia / Baghdad Mayoralty |
| |
|